Installing Ac Input Power Cords - Cisco NCS 6000 Manual

Hide thumbs Also See for NCS 6000:
Table of Contents

Advertisement

Installing the Power Components
Steps
To install a PM slot cover in an AC or DC power tray, follow these steps:
Step 1
Attach the ESD-preventive wrist strap to your wrist and connect its leash to the ESD jack on the front side of the FCC
(see
Preventing Electrostatic
surface on the FCC.
Step 2
Align the PM slot cover with the empty PM slot in the power tray.
Step 3
Insert the two tabs on the top of the PM slot cover into the two holes on the top of the PM slot.
Step 4
Push in the top of the PM slot cover gently until it clicks into place.
Figure 15: PM Slot Cover on the Front of a Power Tray — DC Power Tray Shown

Installing AC Input Power Cords

This section describes how to connect the AC input power cords to the power modules and includes the
following topics:
Prerequisites
Ensure that there is a readily accessible disconnect device incorporated in the building's installation wiring.
Before connecting AC input power cords to the power system, make sure that the input power cords are
Caution
not energized.
Discharge). You can also connect the ESD-preventive wrist strap leash to any bare metal
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
Installing AC Input Power Cords
19

Advertisement

Table of Contents
loading

Table of Contents