Installation; Assembly - Cuenod C 285 Operating Instructions Manual

Gas burners
Table of Contents

Advertisement

Available languages

Available languages

Installation

Assembly

Boiler face
• Prepare face following the enclosed
space requirement diagram.
• If required, insert face counter-plate
(optional)
• Fill in space 1 with recommended
heat-resistant material or material
supplied by the boiler manufacturer.
Chamber pressure take- off pF should
never be choked.
Combustion head
• Position combustion head, so that gas
train is horizontally connected on the
right.
• The other assembly positions are not
allowed.
• Fix and secure combustion head with
its gasket on boiler face.
• Check subsequently for leaks.
Gas train
• Check presence and position of gasket
on the flange of gas train B.
• Install support PG 21 (drawing)
• When fitting gas train, valve coils must
be in high vertical position.
Important
When using a left-mounted VGD gas
train, the SKP75 regulator should pivot
by 180°. To that end :
• Remove regulator SKP75.
• Remove connector (3P + T) on the
side of the regulator, and put it back
together on the opposite side.
Seal off the former position of the
connector.
• Reassemble the regulator after it has
pivoted by a half turn (180°).
05/2008 - Art. Nr. 13 013 503D
Burner Body
• Hook burner body to combustion head
using fixed pin F located on the
opposite side of the gas train.
• Connect the ignition cables on both
transformers.
• Close the burner body with removable
pin E.
• Fix safety screw D.
Connecting the gas pressure take-offs
• Connect coupling pF of the valve to
the coupling labelled pF on the
combustion head with two reversible
preformed tubes (right - left) ,which
are connected up by a coupling (see
drawing).
• Crimp the rings on the tubes.
• Connect the coupling labelled pL to
the coupling pL of the valve.
• Tighten nut by hand.
• Check subsequently for leaks.
Fitting the leaks controller
VPS 504 S02
• Remove the two screws pa and pe on
valve MBVEF, and the two screws 1
and 2 on valve VGD.
• Make sure the two O-rings are
available on the VPS.
• Fasten the VPS with the 4 self-forming
screws
• Connect the cord of plug 7P according
to the electrical diagram.
• Connect plug 7P to the VPS.
• Check subsequently for leaks
Case of valve VGD20 : proceed as
indicated at the beginning of the earlier
paragraph, then :
• Fit the tubes and the terminal block
supplied.
• Fasten the VPS on the terminal block
using the 4 self-forming screws
supplied.
• Proceed afterwards as in earlier
paragraph.
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

C 330C 380C 430 gx 507/8

Table of Contents