Index G200.3 Operating Instructions Manual page 79

Table of Contents

Advertisement

Maintenance Summary - 2.000 Operating hours
Procedure
Maintenance Instructions
G200.3 G220.3
DIE248EN - 15.08.2022
Slat/shingle cover (STRAPANO - Arnold) G420
1
Slider
2
Holder (two-piece)
3
Slat/shingle cover (carrier material)
This additional cover consists of three components. During visual inspection, check
only the condition of the substrate, the slider and the holder.
1. Check the overall condition of the substrate. Assess wear. If individual parts
such as sliders, holders or carrier material are destroyed, it is imperative that
they be replaced.
2.
Cutting injury due to sharp-edged sheet metal parts.
Always wear suitable protective gloves.
Caution
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G220.3G200G220

Table of Contents