Valve On Tank Assembly - Pentair Fleck 3150 NXT Installer Manual

Hide thumbs Also See for Fleck 3150 NXT:
Table of Contents

Advertisement

Installer manual Fleck 3150 NXT/NXT2 - Installation
Side mounted configuration example
Upper
distributor
A-2742-FU
Side mounted
adapter 18023
Tank
C-4278-F7
Upper
distributor
A-2742-FL
5.6

Valve on tank assembly

1. Lubricate the seals with approved silicone grease.
2. Spin the valve (1) onto the tank (2), ensuring the threads are not cross-threaded.
3. Rotate the valve (1) clockwise and freely, without using force until it comes to a stop.
Info
This stop position is considered point zero.
4. Rotate the valve (1) clockwise from point zero to between ¼ turn and ½ turn.
Caution - material
Risk of damage due to excessive force !
Do NOT exceed 27 Nm of torque when installing the valve. Exceeding this limit may
damage the threads and cause failure.
48 / 190
Valve 3150 NXT
SBV 28182
Air check 18979
Ref. MKT-IM-010 / F - 16.01.2023

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents