Regeneration Flows - Pentair Fleck 3150 NXT Installer Manual

Hide thumbs Also See for Fleck 3150 NXT:
Table of Contents

Advertisement

5.8

Regeneration flows

Mandatory
For all multiple tank systems 5 and 6, NBP version valves must be used !
For all multiple tank systems 7, 8 (for NXT2 only), 9 and 14, WBP version valves must
be used in combination with solenoid valves in the outlet !
The solenoid valve must be connected to P6 for NXT (see NXT controller connections
[
Page 62]) OUTPUT 24 VAC 50/60Hz, 0.25 A, MAX or to P18 (for NXT2, see NXT2
controller connections [
Info
In this chapter, systems up to four valves are used to describe and illustrate the
different multiple valves systems, even if the described system with time NXT2 may
control more than four valves.
Metered immediate:
The controller monitors the volume of water used. As soon as the capacity is exhausted, the
controller starts the regeneration process.
Metered delayed:
The controller monitors the volume of water used. When the remaining capacity is less than the
programmed reserve, the controller queues a regeneration that will start at the programmed
regeneration time.
Time clock:
The controller initiates the regeneration at regular preset time interval at the programmed
regeneration time.
Remote regen start:
The controller initiates the regeneration when an external dry signal is acquired on the S2
terminal (see Electrical connections [
duration).
For NXT2 controller only
Day of the week
The controller initiates the regeneration at the programmed regeneration time on preset day(s) of
the week.
Ref. MKT-IM-010 / F - 16.01.2023
Page 63]) OUTPUT 24 VDC, 0.25 A, MAX !
Page 61], signal must last at least the programmed signal
Installer manual Fleck 3150 NXT/NXT2 - Installation
53 / 190

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 3150 nxt2

Table of Contents