Checkpoints before using system

Checkpoints before using system
1. Check of wiring
1) Check once again whether wiring at the rear side of product is properly done.
2. O peration test
1) Server Program is executed if changing the O P/ SETUP switch to op mode at the rear side of SI-100.
2) Input source unit test: Check whether connection with source unit is done by monitoring each source from
the monitoring screen.
3) Test of AMP failure: Check the AMP area which is setup at Setup program is properly appeared on the main
screen. Check each of the AMP status is normal. Check the relevant AMP when the area is displayed 'ERROR'.
4) Test using SR-100: Check connection with a Remote MIC Station, and execute SR-100 at the relevant area.
Then press the monitoring button on the front side of SM-100 and check that sound source is output to the
front speaker of SM-100.
5) Broadcasting test using operation program: Select the zone to broadcast and then press the broadcasting
[Start] button, and then check that broadcasting is sent to the relevant area.
6) Remote program test: By connecting with the SI-100 Server, download program, and check remote access
status by testing access status and broadcasting test.
7) EMERGEN CY broadcasting test: Perform contact test after checking Macro setup at the Setup Program at
the rear side of the SI-100 unit.
Reference : For descriptions required for operation of the SI-100 Server O peration Program, see the
[IPC SYSTEM O P Manual].
IN TER-M P.A CO N VERGEN CE SYSTEM
IPC SYSTEM
51

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IPC SYSTEM and is the answer not in the manual?

Table of Contents