The PROBE adjustment is performed in two steps:
55
a) Application of mV signal:
(*) RTD2, for PROBE adjustment, refers to the drawing shown above.
b) Application of standard resistors:
Connect a decade box or standard resistor to the probe connector, at positions RTD1, RTD2, RTD3 and
RTD4, as shown above.
CJC adjustment
The adjustment of the cold junction related to the thermocouple output is similar to the one related to the
thermocouple input. But the temperature should take at the GND OUT terminal.
mV Signal
Terminals
V_2
RTD2(+)*
V_1
RTD2(+)*
resistors
R_2
R_1
Bornes
1
point
st
GND OUT (-)
100.000mV
GND OUT (-)
120.000mV
1
st
point
20.000 
100.000 
2
point
nd
120.000 mV
600.00 mV
2
nd
point
50.000 
500.000 