Thermo Scientific MaxQ SHKE416HP Operating And Maintenance Manual page 11

High performance orbital shakers
Table of Contents

Advertisement

Section 1
Installation and Start-Up
Installing the Platform
(continued)
1-4
Orbital Shakers
Figure 1-6. Platform Mounting Hole Locations
1. Insert the two 1/4-20 alignment pins into the two mounting holes
identified in Figures 1-5 and 1-6.
2. Rotate the drive mechanism until the four mounting holes generally
match the holes in the platform.
3. Place the platform onto the shaker and over the alignment pins.
4. Move the platform in an orbital motion until one or more of the
center mounting holes are located.
5. Insert the hex socket head screws as the four holes are located. Do not
tighten the screws.
6. Remove the 1/4-20 alignment pins and replace them with the
remaining two hex socket screws.
7. Tighten all screws using the T-handle wrench.
Caution Use only the hex socket flat screws to fasten the platform, and
only the T-handle wrench to tighten the screws. Torque these screws to 10
ft/lbs.
s
Thermo Scientific

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maxq shke430hp

Table of Contents