Connecting The Probe Assembly To A Upc² System - Waters Xevo TQ-S cronos Overview And Maintenance Manual

Table of Contents

Advertisement

Figure 3–19: Fitting the probe inlet fitting
Fitting spring retainer
Probe inlet fitting
3.1.8 Connecting the probe assembly to a UPC² system
To connect the probe assembly to a UPC² system, first fit the supplied UPC² inlet fitting to the end
of the probe assembly. The probe assembly connects to the UPC² system's Isocratic Solvent
Manager (ISM).
Requirement:
UPC² system. Do not use the PEEK inlet fitting.
Required materials
• Chemical-resistant, powder-free gloves
• 1/4-inch open-end wrench
To connect the probe to a UPC² system:
Warning:
To avoid personal contamination with biologically hazardous or toxic compounds,
wear clean, chemical-resistant, powder-free gloves when performing this procedure.
1. Slide the compression nut, backing ring, and ferrule onto the inlet end of the probe
assembly.
You must use the supplied UPC² fitting to connect the probe assembly to a
January 10, 2022, 715006200 Ver. 01 (previously released as Rev. A)
Page 62

Advertisement

Table of Contents
loading

Table of Contents