Figure 5-47 Installing DC power cables (BBB box, with neutral wires)

5.7.5 Installing Communications Cables

Installing Communications Cables Between Lithium Battery Cabinets
You are advised to place lithium battery cabinets and connect parallel cables in
the sequence shown in the figure to avoid inconsistency between the actual
number of a lithium battery cabinet and the number displayed on its monitoring
screen. If the number displayed on the monitoring screen of a lithium battery
cabinet is
another lithium battery cabinet, the number displayed on the monitoring screen of
the latter lithium battery cabinet is
Figure 5-48 Installing communications cables between lithium battery cabinets
(using three parallel cabinets as an example)
Issue 13 (2023-03-26)
NO TICE
N and its PARALLEL1 port is connected to the PARALLEL2 port of
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Installation and Cable Connection
N +1.