6.1 Checking Before Power-On

Step 1 Check that the UPS is powered on and works properly in normal mode.
Step 2 Check that the ready switch on the BCU is in ready state.
Figure 6-1 Ready state
----End

6.2 Connecting the Battery Supply

Wear personal protective equipment and use dedicated insulated tools to avoid
electric shocks or short circuits.
Issue 13 (2023-03-26)
6

Power-On and Commissioning

D ANGER
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Power-On and Commissioning
107