5.2 Installation Preparations

5.2.1 Tools and Instruments

The onsite operation personnel can select tools based on the site requirements.
Personal protective equipment
Safety helmet
Issue 13 (2023-03-26)
NO TE
The cabinets can be installed with one side against a wall. It is recommended that the
distance between the cabinet side and the wall be at least 400 mm.
Goggles
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Lithium battery side
cabinet
Protective shoes
5 Installation and Cable Connection
(3) Slave cabinet
Reflective vest
52