Connecting The Remote Display; Operation; Switching On The Unit; Charging The Battery - LEAB ABC SCHUTZKLASSE II User Manual

Table of Contents

Advertisement

LEAB Automotive GmbH

9.5 Connecting the remote display

The remote display shows the charge status of the battery via an LED.
To connect the remote display, proceed as follows:
1. Plug the connecting cable for the remote display into the connector for the
remote display of the charger.
ð The remote display is connected.

10 Operation

10.1 Switching on the unit

To switch on the unit, proceed as follows:
1. Connect the mains plug to a 230 V mains.
2. If your unit is equipped with an on/off switch, set the switch to position I.
ð Charging starts automatically.
ð The unit is switched on.

10.2 Charging the battery

The ABC charger begins to charge the battery as soon as it is switched on.
LEAB Automotive GmbH
Thorshammer 6
10 Operation
24866 Busdorf
15

Advertisement

Table of Contents
loading

Table of Contents