Foundation Plan - ATH-Heinl 55HAP Manual

4-post lift
Hide thumbs Also See for 55HAP:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 74
2.9.1

Foundation plan

Attention
Do not mount the lifting platform on asphalt or soft screed. There must be no expansion joints
or cracks that would interrupt the continuity of the reinforcement. The load bearing capacity
of false ceilings must be checked by the operator.
The lifting platform may be impaired in its function by standing at an angle.
Observe the specified concrete quality and curing time
Concrete quality
Curing time of concrete
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
90
Release date: 16.03.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
C20/25
Min. 20 days

Advertisement

Table of Contents
loading

Table of Contents