ATTENTION: Follow the instructions to prevent personal injury or damage TIP: Gives additional information on features and tips for efficiently using of the device. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Description of lift ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 5
This safety device prevents a lowering of the lift of more than 100 mm in case of any arbitrary defect. Electric magnets are unlocking this device when lowering the lift. 11. Light barrier Guarantees a secure synchronization of both scissors. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
(8) ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 7
Position: ADJ indicates that the lift is in the adjustment mode 9. Switch for light barrier Bridging of the light barrier for adjustment– resp. installation works. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 8
C = Magnetic valve D = Emergency hand pump E = Lowering valve F = Leveling valves G = Manometer ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Technical data For in-ground installation: ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 10
For on-ground installation: ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
After removing the packing, check that they are taken to special waste collecting areas inaccesible to children and animals as long as they are not disposed. Storage temperature: -10℃~+40 °C INSTALLATION ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
The lift is designed for an installation in dry rooms. The installation in wet rooms as well as in rooms with a risk of explosion is not allowed. Furthermore the installation outside is not allowed. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Before fixing with dowels make sure that both scissors are aligned, if necessary align with washers or plates. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 17
Main lift Freewheel lift B-1 = Main cylinder A-1 = Main cylinder B-2 = Second cylinder A-2 = Second cylinder ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 18
A-2 = Second cylinder freewheel lift AV1 = Unlocking freewheel lift AV2 = Unlocking main lift AV3 = Lowering speed acceleration valve ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 19
Lift and lower the main lift appr. 3 times and check the synchronization. If a synchronization is not given, repeat the previous steps again. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 20
Loosen the bleeding screw as to be seen in the adjacent picture for bleeding the cylinder. Following retighten the bleeding screw again. 18-1 18-2 ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 21
Clamping thickness B depends on flooring 10. Adjustment of lift ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 22
By using the turn plate for wheel alignment it can be adjusted by means of the subjacent screw (optional). ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 23
For an optimal corrosion protection we recommend to make a cavity sealing. Furthermore a suitable silicone for the gaps must be used. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
14. Do not clean the lift under running water. 15. During lifting and lowering the danger zone must be kept entirely clear ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
MAINTENANCE, DISPOSAL Maintenance works on the lift are made by: ________________ Responsible for disposal (e.g. used oil): ________________ ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Lower the lift completely. b. Remove if necessary the used rubber plates. c. Drive the vehicle from the lift. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Lubricate the slides Lift raises after releasing the button Defekive button Changing the defective button further Defektive contactor Changing the defective button ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 28
Check capacity of circuit breaker Replace the fuses Circuit breaker is activated Check damages on the cable Replace the cable ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Cylinder sealing Oil loss and deformation Hydraulic oil Changing Every 3 years (recommended) Hydraulic system Cleaning Every 6 years Hoses Changing ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
4. Turn the emergency down screw on the lowering valve slowly counterclockwise. 5. After the lift is completely lowered, close the emergency down screw by turning it clockwise. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
QV1: Air valve for main lift QV2: Air valve for freewheel lift QY3: Air valve for accelerating the lowering of freewheel lift PH: Light barrier ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
AV3: Lowering speed acceleration valve LU: Compressed air maintenance unit (not in scope of delivery CO: Compressor (not in scope of delivery) ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Latent defect (Shipping damage is discovered upon unpacking the goods, send damage report with pictures within 24 hours to ATH-Heinl) Ort & Datum / Place & date Unterschrift & Stempel / Sign & stamp ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 65
(according to operation instructions and/or instructions), faulty electrical connections (rotating field, rated voltage, fuse protection) or improper use (overload, outdoor installation, technical changes)! ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
CHECKING BOOK Vehicle lift ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 67
Fill in all the following information Manufacturer & type of the used anchor bolts: Manufacturer & type of the used hydraulic oil: ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 68
Date and signature of operator Name of operator Date and signature of operator Name of operator Date and signature of operator ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 69
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 70
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 71
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 72
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 73
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 74
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 75
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 76
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 77
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 78
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 79
Name and stamp of operator Date and signature of operator The operator confirms with his signature that the floor meets the requirements. ® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...
Page 80
® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 08/2014...