Self Test Configuration Page - RT Systems TM3 Installation And User Manual

Table of Contents

Advertisement

self test configuration page

From the Home Page of the TM3 Monitoring Unit select Configuration Page and from the option list select Self Test. The following page
will be displayed:
The following data can be configured:
Day of scheduled weekly Self Test
n
Time for scheduled weekly Self Test
n
Send Self Test Result to e-mail addresses
n
Select Save to store data on the unit after all fields have been configured. Select Cancel and follow the prompted instructions to revert
back to the previous settings. The data will not be stored in this case.
Select the day of the week when the scheduled self test will be performed.
Enter the time of day when the scheduled self test will be performed.
Tick this box if the self test result is required to be e-mailed to the addresses
configured in the Ethernet/Internet Configuration Page.
29
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TM3 and is the answer not in the manual?

Questions and answers

Table of Contents