Loading The Project Into The El6930; Fig. 32 Loading The Project Into The El6930 - Beckhoff EL6930 Operating Instructions Manual

Twinsafe logic terminal with profisafe gateway
Table of Contents

Advertisement

5.3.11

Loading the project into the EL6930

The project is loaded into the EL6930 via the fieldbus.
Use only qualified tools
Only use a qualified tool for loading, verifying and enabling the project on the EL6930!
Click the Download button on the TwinSAFE Verifier tab for loading the project.
The user must enter
• his user name (default: Administrator),
• the terminal serial number (printed on the outside, e.g. 197535), and
• his password (default: TwinSAFE).
User name and password are case-sensitive
Pay attention to upper/lower case characters for the user name and password.
Fig. 32: Loading the project into the EL6930
The project is then displayed in text mode, and the user has to confirm consistency between the information
displayed and the currently projected application by re-entering the password. The project is then started on
the EL6930.
EL6930
CAUTION
Version: 2.0.0
Operation
47

Advertisement

Table of Contents
loading

Table of Contents