Planmeca Intra Quick Reference Manual page 2

Hide thumbs Also See for Intra:
Table of Contents

Advertisement

The manufacturer, assembler, and importer are responsible for the safety,
reliability and performance of the unit only if:
Installation, calibration, modification and repairs are carried out
-
by qualified authorized personnel.
Electrical installations are carried out according to the appropriate
-
requirements such as IEC364.
Equipment is used according to the operating instructions
-
Planmeca pursues a policy of continual product development. Although
every effort is made to produce up-to-date product documentation this
publication should not be regarded as an infallible guide to current
specifications. We reserve the right to make changes without prior notice.
COPYRIGHT PLANMECA USA 2010-09
Publication Revision 4 JO
Quick Reference Manual
2

Advertisement

Table of Contents
loading

Table of Contents