Pressure Equalization Prior To Startup - Daikin SkyAir RZR-P Series Service Manual

Cooling only / heat pump r-410a 60hz
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

Special Control
3.7

Pressure Equalization Prior to Startup

Ta: Outdoor air temperature
Pc: High-pressure sensor detection value
Pe: Low-pressure sensor detection value
Before activating the compressor, the activation load is lightened by equalization across the
compressor. In addition, inverters turn ON electricity and capacitors are charged.
Parts Name
Symbol
Compressor
(INV.)
Outdoor unit
fan
Four-way
20S1
valve
Electronic
expansion
EV1
valve (Main)
Solenoid valve
SVP
(Hot gas)
Solenoid valve
(Receiver gas
SVG
discharging)
Ending conditions
Function and Control
Electric Symbol
RZR18/24/32P
RZR36/42P
RZQ18/24/30P
RZQ36/42P
M1C
M1C
M1F
M1F
M2F
Y1S
Y1S
Y1E
Y1E
Y2S
Y2S
Y3S
Operation
OFF
Cooling: OFF
Heating: Ta > 78.8°F; STEP 8,
Ta 78.8°F; OFF
Keep former condition.
0 pls
ON
OFF
 3 minutes
OR
 Pc – Pe < 29 psi
SiUS281117
Remarks
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents