7.3 -
GENERAL INFORMATION ON THE LINE
The equipment must be installed on the line in compliance with:
•
the direction of gas flow as indicated by the arrow on the equipment itself;
•
the correct mounting position:
NOTICE!
When used in gas pressure reduction stations, the device must be installed at least according to the re-
quirements of standards UNI EN 12186:2014 or UNI EN 12279:2007.
Equipment vents must be ducted in accordance with UNI EN 12186:2014 or UNI EN 12279:2007 or the
standards in force at the place of installation of the equipment.
LOW-PRESSURE GAS REGULATOR
EN
Use, maintenance and warning manual
Fig. 7.12.
Correct installation position Standard/Goval versions
|
INSTALLATION
|
REV. A
54