Chapter 6 Power cables connection
Chapter 6 Power cables connection
ATTENTION:
This product is not shipped with any power cables. It must be hard-wired
with a power cable to utility power. Ensure that a licensed electrician
performs the installation per the national electrical code.
Hardwiring the UPS unit to utility power is customer responsibility.
IEC 60309 connectors may have a lower power rating than what is
required for the upstream circuit breaker protecting the UPS unit.
Important: Hardwiring the UPS unit to utility power is customer responsibility.
This connection must be carried out by qualified and licensed electrician following the
national electrical code. Before carrying out any connection, check that the upstream
protection devices (Normal AC source and Bypass AC source) are open " " (off).
Always connect the ground wire first.
Important: Before connecting the HotSwap MBP to the UPS, make sure the UPS has been properly
shut down. Always connect the ground wire first.
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG
71