Chapter 10 UPS maintenance
12. Use the T10 Torx screwdriver and screw the two screws back on the right hand side of
the LCD display. Put the display carefully back into place until it covers the screws on
the right hand side
13. Use the T10 Torx screwdriver to screw in the screws on the right hand side
14. Complete assembling the bezel
15. Turn on the upstream utility power circuit breaker to which the UPS is connected to. The
UPS front panel display illuminates and shows the Lenovo or IBM logo
16. Verify that the UPS status screen shows X, press X to restart
17. Press the button on the UPS front panel for at least 3 seconds. The UPS front panel
display changes status to
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG
"UPS
starting..."
163