Power-Off Process - Huawei LUNA2000-200KWH-2H1 Smart String ESS Maintenance Manual

Hide thumbs Also See for LUNA2000-200KWH-2H1 Smart String ESS:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual

2.2.2 Power-Off Process

Table 2-1 Procedure
Step
1
2
3
4
5
6
Figure 2-2 Power-off process
Issue 02 (2023-02-28)
Item
Powering
Powering off the battery side
off the AC
of the AC power distribution
side of the
cabinet
Smart PCS
Powering
Powering off the output DC
off the
circuit breakers
ESS
Powering off the auxiliary
power supply (turn off the
AC switches and then the DC
switches)
Powering off the DC circuit
breakers of battery racks
Powering
Powering off the 220 V AC
off the
auxiliary power supply
auxiliary
(Optional) Powering off the
power
UPS
supply
disconnect
ion
Copyright © Huawei Digital Power Technologies Co., Ltd.
2 Routine Maintenance
Remarks
As shown by (1) in
Figure
2-2.
As shown by (2) in
Figure
2-2.
As shown by (3) in
Figure
2-2.
As shown by (4) in
Figure
2-2.
As shown by (5) in
Figure
2-2.
As shown by (6) and (7)
in
Figure
2-2.
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-2h1

Table of Contents