LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Prerequisites
Fault locating:
1.
2.
Figure 19-1 Position of the T/H sensor
Procedure
Step 1 Record the DIP switch settings.
Issue 02 (2023-02-28)
19
Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or
management system and check alarms.
Refer to the alarm handling suggestions in the alarm list.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Replacing a T/H Sensor
19 Replacing a T/H Sensor
134