Huawei LUNA2000-200KWH-2H1 Smart String ESS Maintenance Manual page 106

Hide thumbs Also See for LUNA2000-200KWH-2H1 Smart String ESS:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Follow-up Procedure
Step 1 Turn on the power switch of the air conditioner in the cabinet.
Step 2 Log in to the CMU, choose MaintenanceConnect DeviceRemove Device, and
remove the old air conditioner.
Figure 8-14 Removing the old air conditioner
Step 3 Click Auto. Search and add the new air conditioner.
Figure 8-15 Adding the new air conditioner
Issue 02 (2023-02-28)
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Replacing an Air Conditioner
100

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-2h1

Table of Contents