LUNA2000-200KWH-2H1 Smart String ESS
Maintenance Manual
Follow-up Procedure
Step 1 Turn on AC switch 1FCB1 of the CMU adapter power supply.
Step 2 Turn on DC switches 1Q1 and 1Q2 of the ESS.
Step 3 Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or management
system and check that the communication is normal and that no related alarm is
generated.
Step 4 Log in to the SmartLogger WebUI, CMU WebUI, FusionSolar app, or management
system and send a startup command to the rack controller.
Step 5 Check the running status of the system and ensure that the functions are restored.
Step 6 (Optional) If the full configuration file is exported before device replacement, log
in to the CMU WebUI and import the exported configuration file to the new
device. Otherwise, skip this step.
1.
Issue 02 (2023-02-28)
Choose MaintenanceSystem Maint., and click Import under Full profile
import
NO TE
In the Re-authentication dialog box, enter Password of current user and set
Encryption password of the imported file.
NO TICE
To replace the CMU, export the full configuration file excluding certificate-
related files. After the full configuration file is imported, you need to reload a
third-party certificate if required.
Copyright © Huawei Digital Power Technologies Co., Ltd.
16 Replacing a CMU