Power-On Process - Huawei LUNA2000-200KWH-100KW-2H1 Quick Manual

Smart string energy storage system
Hide thumbs Also See for LUNA2000-200KWH-100KW-2H1:
Table of Contents

Advertisement

8.2

Power-On Process

Check all equipment before power-on. For details, see the corresponding user manuals.
Incorrect cable connections may damage the Smart PCS. Check that cables are
correctly connected before the first power-on. If any exception occurs during the
power-on process, stop the operation. You can proceed with the operation only after
the exception has been handled.