Procedure
Step 1 Disconnect cables from the CMU and label the cables.
Step 2 Remove the faulty I/O expansion board.
Figure 25-2 Removing the I/O expansion board
Step 3 Install a new I/O expansion board.
Figure 25-3 Installing an I/O expansion board
Step 4 Reinstall the cables.
----End
Issue 02 (2023-02-28)
c.
Turn off the ESS battery rack DC switch 1Q1.
d.
Turn off AC switch 1FCB1 of the CMU adapter power supply.