Carrying Out Measurement - KERN DLT-N Operating Manual

Electronic moisture analyser
Table of Contents

Advertisement

12 Carrying Out Measurement

During the first start-up set the drying parameters as described in chap. 11.
(1) Start-up
Turning on moisture meter, see chap. 6.6. In order to obtain exact results, the
instrument must have reached its operating temperature (see warm-up time
chap. 1). For this warm-up time the instrument must be connected to the power
supply.
(2) Select drying program
54
Tap <Moisture Determination>.
There are three options for loading the work
screen (See chap.7.2) used to start a drying
cycle:
Either
Set drying parameters manually in <
Manual parameters setup >,
See chap. 11.1.
or
Tap < Database parameters setup >
in order to load a program suitable for the
sample from the database (See chap.
11.2.
or
Use the shortcut keys M1-M5,
provided they are enabled (See chap.
11.2.
DLT_N-BA-e-1421

Advertisement

Table of Contents
loading

Table of Contents