Initial Operation; Mounting The Circulator; Mount Heating Or Refrigerated Circulator - Julabo DYNEO DD Operating Manual

Circulator
Table of Contents

Advertisement

1.888.610.7664
7

Initial operation

7.1

Mounting the circulator

7.1.1 Mount heating or refrigerated circulator

In the case of a heating circulator or a refrigerated circulator, the circulator is
mounted on the closed bath or on cooling machine.
If the circulator is disassembled, e.g. due to a change of device or for service
purposes, it can then be easily reassembled with the connecting box.
 Allen key, size 3 mm
 The circulator is ready to be mounted on a closed bath or cooling machine.
 The bath is empty.
1. Carefully insert the circulator into the bath.
 Align the bath's four threaded sleeves with the four holes on the connection
box.
2. Place the four mounting screws into the holes on the connection box.
3. Tighten the mounting screws [right image].
4. Check that the circulator is seated correctly, and that the connection box
gasket is seated on the unit surface without any gaps.
 The heating circulator or refrigerated circulator is mounted.
www.calcert.com
15
10
20
5
25
0
30
Initial operation
43
sales@calcert.com

Advertisement

Table of Contents
loading

Table of Contents