Figure 47 Example Of A Backend Cable Connection (When Eight Des (Hd-De) Are Installed For Each Node; Connected Between Multiple Racks) - Fujitsu ETERNUS DX8100 S4 Site Planning Manual

Hybrid storage systems
Table of Contents

Advertisement

2. Rack Installation Specifications
Rack Installation Requirements
Figure 47

Connected between Multiple Racks)

Base rack (rear)
: Cables that are supplied as standard (3.5m)
: Extension cables (6.0m)
Example of a Backend Cable Connection (When Eight DEs (HD-DE) Are Installed for Each Node
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
CE#0
FE
PDU#5
PDU#4
PDU#3
PDU#2
Expansion rack#0 (rear)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
DE (HD-DE)
CE#1
DE (HD-DE)
DE (HD-DE)
PDU#7
PDU#6
PDU#5
PDU#4
PDU#3
PDU#2
67
Site Planning Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx8900 s4

Table of Contents