Figure 35 Example Of An Installation To 19-Inch Racks (For Gs, 2000Mm) (When 15 Drive Enclosures Are Connected Per Node) - Fujitsu ETERNUS DX8100 S4 Site Planning Manual

Hybrid storage systems
Table of Contents

Advertisement

2. Rack Installation Specifications
Rack Installation Requirements
Installation Examples for Mainframe Connections
SCCI is installed on the front side of the base rack. The position is the same as the power distribution unit
on the back side.
A single frontend enclosure is installed in a base rack.
Install controller enclosures and drive enclosures on a per node basis.
Install the enclosures in ascending order starting from the node with the smallest controller enclosure
number.
Figure 35
Connected per Node)
Base rack
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
CE#0
FE
SCCI
PDU#5
PDU#4
PDU#1
PDU#3
PDU#0
PDU#2
Front
Example of an Installation to 19-inch Racks (for GS, 2000mm) (When 15 Drive Enclosures Are
Expansion rack#0
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
CE#1
DE
DE
PDU#5
PDU#4
PDU#1
PDU#3
PDU#0
PDU#2
Rear
Front
Expansion rack#1
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
CE#2
DE
PDU#5
PDU#4
PDU#1
PDU#3
PDU#0
PDU#2
Rear
Front
Rear
50
Expansion rack#2
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
DE
CE#3
PDU#5
PDU#4
PDU#1
PDU#3
PDU#0
PDU#2
Front
Rear
Site Planning Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx8900 s4

Table of Contents