9
IN120 /IN220 Installation Instructions (Continued)
4
Supplying Power to the Controller
Important - before inserting PoE plug into PoE connector, apply dielectric grease to top
of plug, covering the pin area (Fig. 18a).
A. IN220 (PoE)
1. Once controller is securely in place, connect RJ45 male
connector to female RJ45 port on controller board (Fig. 18a).
2. If power is enabled, LED will flash and lock motor will cycle.
B. IN120(Wi-Fi)
1. Once controller is securely in place, place (6) "AA" alkaline
batteries in the compartment, being careful to align polarity
properly.
2. After batteries are installed, there is a slight delay; LED will
flash and the lock motor will cycle.
Apply grease
Fig. 18a
Fig. 18b
28
Copyright © 2016, 2019, 2021, ASSA ABLOY Access and Egress Hardware Group, Inc.
All rights reserved. Reproduction in whole or in part without the express written permission
of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
IN120 & IN220 Series
ED5200N / ED5600N Series
Exit Devices for 9100/9M100

Advertisement