Huawei FusionCol8000-E260 Quick Manual page 6

Modular indirect evaporative cooling system
Hide thumbs Also See for FusionCol8000-E260:
Table of Contents

Advertisement

FusionCol8000-E260 Modular Indirect Evaporative
Cooling System
Quick Guide (Building Scenario)
Contents
7.5.1 Preparing a Network Cable............................................................................................................................................29
7.5.2 FE Teamwork + FE Monitoring..................................................................................................................................... 30
7.5.3 FE Teamwork + RS485 Monitoring.............................................................................................................................. 32
7.5.4 CAN Teamwork + FE Monitoring................................................................................................................................. 34
7.5.5 CAN Teamwork + RS485 Monitoring..........................................................................................................................35
7.6 (Optional) Installing Signal Cables.................................................................................................................................36
7.7 (Optional) Installing T/H Sensors Outside the Unit and Cables.......................................................................... 39
7.8 (Optional) Installing the Cable for a Cable-Type Water Sensor........................................................................... 41
8 Installing Air Dampers and Air Ducts...............................................................................46
8.1 Precautions.............................................................................................................................................................................. 46
8.2 Installing Air Dampers........................................................................................................................................................ 47
8.2.1 Installing DO Air Dampers............................................................................................................................................. 47
8.2.2 Installing AO Air Dampers............................................................................................................................................. 50
8.3 Installing Air Ducts............................................................................................................................................................... 52
9 Sealing Cable Holes and Reinstalling Protective Panels............................................. 54
10 Verifying the Installation.................................................................................................. 55
11 Power-On Commissioning................................................................................................. 58
11.1 Preparing for Power-On................................................................................................................................................... 58
11.2 (Optional) Commissioning Continuous Cooling Devices......................................................................................58
11.3 Powering On the Unit....................................................................................................................................................... 59
11.4 Home Screen........................................................................................................................................................................ 71
11.5 Initial Configuration.......................................................................................................................................................... 74
11.5.1 Setting T/H Sensor Parameters.................................................................................................................................. 74
11.5.2 (Optional) Setting Conductivity Sensor Parameters........................................................................................... 77
11.5.3 (Optional) Setting Teamwork Parameters............................................................................................................. 77
11.5.4 Setting Communications Parameters....................................................................................................................... 83
11.5.4.1 Setting Access Control Parameters........................................................................................................................ 83
11.5.4.2 Setting Communications Parameters (Modbus-RTU Protocol)................................................................... 84
11.5.4.3 Setting Communications Parameters (Modbus-TCP Protocol).................................................................... 85
11.5.4.4 Setting Communications Parameters (SNMP Protocol).................................................................................87
11.5.4.5 (Optional) Setting WiFi Parameters......................................................................................................................90
11.5.5 (Optional) Setting Parameters for a Cable-Type Water Sensor......................................................................91
11.6 Startup.................................................................................................................................................................................... 91
11.7 Wizard Startup.................................................................................................................................................................... 92
11.8 (Optional) Power-Off........................................................................................................................................................95
11.9 Checking After Commissioning......................................................................................................................................95
A Base Drawings....................................................................................................................... 97
A.1 Concrete Platform Scenario.............................................................................................................................................. 97
A.2 Steel Base Scenario.............................................................................................................................................................. 99
B Physical Ports....................................................................................................................... 104
Issue 03 (2022-11-25)
Copyright © Huawei Digital Power Technologies Co., Ltd.
v

Advertisement

Table of Contents
loading

Table of Contents