FusionCol8000-E260 Modular Indirect Evaporative
Cooling System
Quick Guide (Building Scenario)
Step 4 Follow the onscreen instructions to complete the wizard-based startup.
1.
2.
Issue 03 (2022-11-25)
Figure 11-16 Checking before startup
Select the items that are involved in wizard-based startup (all items are
selected by default when you access the commissioning item selection screen
for the first time) and confirm whether to start the task.
–
Tap Yes to start the system and commission components.
–
Tap No to exit the commissioning while keeping the system shut down.
Figure 11-17 Wizard Startup
NO TE
After a component is commissioned successfully, the system automatically proceeds
with the next component you selected. Please wait during the commissioning.
Check the commissioning result.
–
If the message "Commissioning succeeded" is displayed in the lower left
corner, tap Confirm. The home screen is displayed.
–
If the message "Commissioning failed" is displayed in the lower left
corner:
i.
Click the link at "Commissioning failed" to view the failure cause, tap
Back and Confirm, and troubleshoot based on the failure cause.
ii.
On the home screen, choose Maint > Wizard Startup and perform
commissioning again.
Copyright © Huawei Digital Power Technologies Co., Ltd.
11 Power-On Commissioning
94