Install The Cable Track; Prepare For Gantry Install; Open Box 2; Install Gantry Assembly - Carbide 3D Shapeoko 5 Pro Assembly Manual

Cnc router
Table of Contents

Advertisement

1.5 Install the Cable Track

1.
Locate the cable track in the bottom of Box 1.
2. Install the cable track to the last baseframe
member at the back of the machine.
a. Remove the protective coating.
b. Remove the blue adhesive cover.
c. Position with the opening facing up.
d. Align to the bottom edge of the baseframe.
e. Align between the two Y-Axis assemblies,
there will be about 4.5 inches on either side.
f.
From one side, press firmly as you run your
hand over the entire length of the track.
3. Open the cable track.
Figure 1-4
8
1.6 Prepare for Gantry
Install
1.
Pull the Y-Right carriage all the way to the front
of the machine. See Fig . 1-4.
2. Pull the Y-Left carriage all the way to the front.
3. Use a 5mm hex key to remove the two (2)
M6×20mm SHCS from the rear position of the
Y-Right and Y-Left carriages.
NOTE: Keep the M6×20mm SHCS close by. You will
need them to install the gantry.
my.carbide3d.com

1.7 Open Box 2

1.
Open Box 2. This box contains:
a. Shapeoko 5 Pro gantry (note that the X-Axis
drag chain is pre-installed on the gantry).
b. Shapeoko 5 Hybrid Table (aluminum
extrusions and MDF strips).
c. Hybrid Table hardware.
Figure 1-5
support@carbide3d.com

1.8 Install Gantry Assembly

NOTE: This step is much easier with two people.
The X-Axis gantry assembly is heavy and can easily
tip over. If the gantry tips over, the mating faces on
the bottom edge will be irreparably damaged, which
will prevent the gantry from attaching properly to the
Y-Axis assemblies.
1.
Lift the gantry from the box and set it onto the
rear position of the Y-Axis carriage plates, over
the now-empty screw holes. See Fig . 1-5.
a. The large X-Axis carrier plate faces the front.
2. Hold the gantry firmly in place as you complete
the steps on the following page.
9

Advertisement

Table of Contents
loading

Table of Contents