Install Yl Wire Keeper - Carbide 3D Shapeoko 5 Pro Assembly Manual

Cnc router
Table of Contents

Advertisement

6. Use a 2.5mm hex key and two (2) M3×6mm
SHCS to secure the tail of the drag chain at the
rear of the Y-Right assembly. Fully tighten. See
Fig . 4-3.
7. Put the drag chain hardware bag, with the
remaining screws, back in the Wiring Harness
box. You'll need them when we install the router
drag chains in Step 5.
M3×6mm SHCS
Figure 4-3
20

4.2 Install YL Wire Keeper

1.
Move to the back of the machine.
2. Locate the long Y-Left wiring bundle extending
from the wiring harness trunk. It has two plastic
rectangular wire keepers attached.
3. Locate the Y-Left wire keeper at the end of the
cables. "YL" is printed on the bottom side.
4. Slide the wire keeper under the back edge of
the Y-Left assembly (right side when standing at
the back of the machine). See Fig . 4-4.
a. The wires face up.
b. Align the screw holes in the wire keeper with
those in the assembly.
Figure 4-4
my.carbide3d.com
support@carbide3d.com
5. Use a 4mm hex key and two (2) M6×16mm BHCS
to attach the wire keeper to the Y-Left assembly.
Fully tighten. See Fig . 4-4.
6. Open the cable track on the last baseframe
member and slide the wires in, extending them
all the way to Y-Right.
7. Snap the cover back in place to close the cable
track.
a. Make sure all wires are completely in the
track and that no wires are getting pinched.
Y-Left Wire Keeper
21

Advertisement

Table of Contents
loading

Table of Contents