IBM 3745 Connection And Integration Manual page 57

Communication controller, nways multiprotocol controller
Table of Contents

Advertisement

Step
Step
Step
Step
Unplugging or Plugging In an Operator Console Cable
Step
3
Plugging in an HSS cable
Repeat this step for every HSS cable to be plugged in.
Note:
Make sure that all the cables are correctly labeled at both
ends before doing this step.
If you connect the HSS to a DTE equipment (such as IBM
2210 router), for allowing RLSD signal propagation, the DCE
side of the cable must be connected to the HSS and the
DCE side to the router.
a. Refer to the figure of the Step 2 on page 2-8.
b. Locate the cable by the port number written on the label.
c. Plug in the new HSS cable by squeezing the levers and pushing the
cable into place until it clicks.
4
Update CDF
You must perform the Update procedure in "Upgrading or Updating
CDF" on page 5-7. You can either do it now and continue with the next
step or later when you have finished all your connection procedures.
5
Activating the line
Ask the host operator to activate any lines that were plugged in.
Note: If you have installed a link-attached 3745, make sure that the
link IPL port cables are connected before attempting an IPL.
6
You have finished this task
Close and lock the door using the special door key.
Attention
This procedure does not apply for Model 17A.
1
Starting
Before beginning you must first do the procedure "Getting Started" on
page 2-2.
If you are only inserting a console cable, go to Step 3 on page 2-10.
Otherwise continue with the next step.
Chapter 2. 3745 Models 130 to 17A: Connecting LICs and Cables
2-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

3745 a3746-9003746-900nn3746-900ip

Table of Contents