Setting Power On Schedule - IBM 3745 Connection And Integration Manual

Communication controller, nways multiprotocol controller
Table of Contents

Advertisement

Step 12
Step 13

Setting Power On Schedule

Step
Step
Step
Step
Step
Step
5-16
3745 All Models & 3746-900: CIG
The two options are:
F
Selects the modem clock: 1200 bps or 2400 bps (for U.S.A.
and Canada only)
H
Selects the MOSS clock: 1200 bps only.
Do either:
or
then
You have finished this procedure, continue with other integration
procedures.
Note: You must at least do "Saving MOSS from Fixed Disk onto
Diskettes" on page 5-19 when you have finished all other integration
procedures.
1
2
3
Enter the time (hours and minutes) next to each day of the week. Use
24-hour notation that includes two digits for the hours, two digits for the
minutes, and a colon between these numbers (for example, 00:15,
06:05, or 17:00).
4
5
When you see this message:
DATA SUCCESSFULLY TRANSMITTED
then:
6
You have finished this procedure, continue with other integration
procedures.
Note: You must at least do "Saving MOSS from Fixed Disk onto
Diskettes" on page 5-19 then you have finished all other integration
procedures.
IMPORTANT
The power-on schedule is only active when the Power Control display on the
control panel shows the number 2 (for network control).
To set the power-on schedule active, at the IBM 3745 control panel:
Step
1
Press Power Control repeatedly until the number 2 appears
(blinking) as the sixth digit in the display.
Step
2
Press Validate.

Advertisement

Table of Contents
loading

This manual is also suitable for:

3745 a3746-9003746-900nn3746-900ip

Table of Contents