Step 6 Reinstall the epoxy separators between the top copper bars.
Figure 4-53 Reinstalling the epoxy separators
Step 7 Arrange cables, install the top beams (delivered with the product) on the top
cover, and separate the mains input cables, bypass input cables, and output cables
from each other.
Figure 4-54 Installing beams
Step 8 Connect signal cables and bind the cables to the nearest positions in the cabinet.
Issue 03 (2022-11-29)
If you need to log in to the WebUI of the UPS monitoring system, connect the
network port on a PC to the FE port on the monitoring interface card of the
UPS.
If the UPS needs to connect to the NetEco, connect the NetEco to the FE port
on the monitoring interface card of the UPS over a LAN switch.