UPS5000-H-(400 kVA-600 kVA)-FT
User Manual (100 kVA Power Module)
Figure 4-8 Installing an expansion sleeve
(1) M12x60 bolt
(4) Expansion sleeve
Step 3 Move the cabinet to the installation position.
Step 4 Secure the cabinet to the floor.
Figure 4-9 Securing a cabinet
Step 5 Install anchor baffle plates around the cabinet.
Issue 03 (2022-11-29)
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Spring washer
(5) Expansion nut
4 Installation and Cable Connection
(3) Flat washer
(6) Concrete floor
100