Summary of Contents for Huawei UPS5000-H-400K-FT

  • Page 1 UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) Issue Date 2022-11-29 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the UPS5000-H-400K-FT (400K for short), UPS5000- H-500K-FT (500K for short), and UPS5000-H-600K-FT (600K for short) in terms of product introduction, technical specifications, installation, cable connections, single UPS commissioning, parallel system commissioning, product maintenance, troubleshooting, and FAQs, helping readers understand how to use and maintain the UPSs.
  • Page 4 2-7. ● 380 V AC/400 V AC/415 V AC voltage system: A maximum of six UPSs can be connected in parallel. 2022-02-11 This issue is the first official release. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    2.6.5 Intelligent Detection Card.............................. 47 2.6.6 Internal Switch................................... 49 2.7 Optional Components................................. 49 2.7.1 List of Optional Components............................49 2.7.2 Surge Protection Box................................ 50 2.7.3 Dry Contact Extended Card............................51 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 4.7 Installing a Top Protection Component........................116 4.7.1 400K/500K/600K................................116 4.8 Installing Cables.................................. 116 4.8.1 Cable Routing Requirements............................117 4.8.2 Top Cable Routing................................118 4.8.3 Bottom Cable Routing..............................123 4.9 Installing a Top Enclosure Frame..........................129 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7 6.3 Shutting Down and Powering Off a Parallel System..................... 180 6.4 Performing EPO...................................181 6.5 Commissioning a Dual-Bus System..........................181 7 Maintenance.........................183 7.1 UPS Maintenance................................183 7.1.1 Monthly Maintenance..............................184 7.1.2 Quarterly Maintenance..............................184 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8 9.4 Performing EPO...................................204 9.5 Clearing the EPO State..............................204 9.6 Exporting Data..................................205 9.7 Obtaining Active Alarm Details............................. 206 10 Appendix..........................207 10.1 Lifting Trolley..................................207 10.2 Acronyms and Abbreviations............................208 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9: Safety Information

    Equipment damage due to force majeure such as earthquakes, floods, volcanic eruptions, debris flows, lightning strikes, fires, wars, armed conflicts, typhoons, hurricanes, tornadoes, and extreme weather conditions ● Operation beyond the conditions specified in this document Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10: Personal Safety

    D ANGER During operations, use dedicated insulated tools to prevent electric shocks or short circuits. The insulation and voltage resistance must comply with local laws, regulations, standards, and specifications. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11 – Trained personnel: personnel who are trained in technology and safety, have required experience, are aware of possible hazards on themselves in Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12: Equipment Safety

    Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13: Battery Safety

    D ANGER Protect batteries from mechanical vibration, falling, collision, punctures, and strong impact. Otherwise, the batteries may be damaged or catch fire. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 Ensure that no liquid enters the equipment to prevent faults or short circuits. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15 WARNING If the electrolyte leaks, absorb and neutralize the electrolyte immediately. Exercise caution when moving or handling a battery with electrolyte leakage, because the leaking electrolyte is hazardous. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16 ● Batteries are damaged due to your or a third party's reasons, for example, relocating or reinstalling the batteries without complying with the Company's requirements. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17 When installing batteries, do not place installation tools, metal parts, or sundries on the batteries. After the installation is complete, clean up the objects on the batteries and the surrounding area. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18 Intake: Seek immediate medical attention. Special requirements for lead-acid batteries: NO TICE When the battery temperature exceeds 60°C, check whether the electrolyte leaks. If the electrolyte leaks, take proper measures promptly. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19 25% lower flammability limit (LFL). ● The battery room should be equipped with a halogenatedane or perfluorohexanone gas fire extinguishing system, which should interwork with Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20: Electrical Safety

    Before connecting cables, ensure that the equipment is intact. Otherwise, electric shocks or fires may occur. D ANGER Non-standard and improper operations may result in fire or electric shocks. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21 ● Before installing power cables, check that cable labels are correct and cable terminals are insulated. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 ● Ensure that the equipment is connected permanently to the protective ground. Before operating the equipment, check its electrical connection to ensure that it is reliably grounded. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23 Do not perform any improper operations, for example, dropping cables directly from a vehicle. Otherwise, the cable performance may deteriorate due to cable damage, which affects the current-carrying capacity and temperature rise. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24: Environmental Requirements

    Do not expose the equipment to flammable or explosive gas or smoke. Do not perform any operation on the equipment in such environments. D ANGER Do not store any flammable or explosive materials in the equipment area. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25 ● Ensure that the ground in the installation environment is solid, free from spongy or soft soil, and not prone to subsidence. The site must not be located Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26: Mechanical Safety

    Do not use tools that have signs of scratches or fail to pass the inspection or whose inspection validity period has expired. Ensure that the tools are secure and not overloaded. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27 If two persons or more move a heavy object together, ensure that the object is lifted and landed simultaneously and moved at a uniform pace under the supervision of one person. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28 Only trained and qualified personnel are allowed to work at heights. ● Do not work at heights when steel pipes are wet or other risky situations exist. After the preceding conditions no longer exist, the safety owner and Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29 Ensure that the ladder is securely positioned and held firm. ● When climbing up the ladder, keep your body stable and your center of gravity between the side rails, and do not overreach to the sides. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30 During hoisting, do not stand or walk under the crane or the hoisted objects. ● Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 31 To avoid short circuits or other risks, do not drill holes into buried pipes or cables. ● When drilling holes, protect the equipment from shavings. After drilling, clean up any shavings. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32: Product Overview

    (compatible downwards to 200 kVA) ● 500K: rated output capacity 500 kVA (compatible downwards to 200 kVA) ● 400K: rated output capacity 400 kVA (compatible downwards to 200 kVA) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33: Application Scenarios

    In addition to advantages of common parallel systems, the multi-bus system is free from bottleneck failures, but its configuration is complex. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34 Energy control modules (ECMs) on different UPSs are connected over parallel cables to synchronize UPS outputs to supply power to loads. If one UPS fails, another UPS continues supplying power to loads, which ensures system reliability. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35 An optional static transfer switch (STS) can be installed to start the bus synchronization controller (BSC). The UPS systems work in inverter mode or bypass mode. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36: Working Principle And Modes

    The power module consists of a rectifier, inverter, and DC/DC converter. The product converts inputs into pure high-quality sine wave outputs by using the high-frequency switching technology. Figure 2-5 Conceptual diagram Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37 In this case, the UPS obtains energy from both the utility power and batteries, and the energy is converted into AC outputs by the inverter. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38 In either bypass mode or inverter mode, the rectifier is started all the time and charges batteries using a charger. The ECO mode delivers a high efficiency. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39: Product Configurations

    Top Outlet Kit Inductor Cabinet Cabling Cabinet Cabinet Top cable routing, rear air exhaust Bottom cable routing, rear air exhaust Top cable routing, top air exhaust Figure 2-6 Product configurations Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40: Cabinet Description

    ● An optional ECM extended subrack can be installed at the position of the filler panel above the control module. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41 ● An optional ECM extended subrack can be installed at the position of the filler panel above the control module. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 42: Component Description

    It performs AC/DC or DC/DC conversion on the mains and battery inputs, and stabilizes the DC bus voltage. The inverter (DC/AC) converts the inputs into sine wave outputs. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43: Bypass Module

    2.6.2 Bypass Module The UPS supplies power through the bypass under the following circumstances: ● The S-ECO or ECO mode is used and the bypass voltage is within the specified range. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44 Fault ● Steady on: A critical alarm is generated for the indicator bypass. ● Off: No critical alarm is generated for the bypass, or the software is being upgraded. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45: Mdu

    ● Off: The UPS display is not powered on. Man-machine interface MUS05A (DB26) Connects to the MDU and monitoring interface card. Network port. A shielded cable is required. Reserved RS485_1 Reserved FE_1 Reserved Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46: Control Module

    UPS status information to other monitoring modules. ● The system provides three types of CAN communication: monitoring CAN communication, intra-rack parallel CAN communication, and inter-rack parallel CAN communication. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47 FAULT Fault ● Steady on: The ECM has a critical alarm. indicator ● Off: The ECM has no critical alarm or the software of the ECM is being upgraded. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 48: Dry Contact Card

    ● DI ports have built-in power supplies with a maximum voltage and current of 12 V DC/16 mA. During cable connection, ensure that the voltage and current do not exceed these maximum values. Figure 2-16 Appearance Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49 ● Grounded: BCB After the setting detecting the box connected takes effect, the BCB box system will ● Disconnected: detect whether BCB box not the BCB is connected online. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50 OFF. the inverter on The value can be the rack in the changed to Open: parallel ● OUT port open: connection The PDC output scenario. switch is ON. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51 The bypass input maintenance switch or system bypass circuit maintenance breaker closed switch is ON. alarm and ● BP port closed: transfer to static The bypass input bypass mode. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 52: Monitoring Interface Card

    (MDU). ● The monitoring interface card provides the ambient temperature and humidity (T/H) sensor port, FE port, battery temperature monitoring port, and network management port. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53 ● Connects to an ambient T/H sensor over two communications wires. port 1 ● Supported protocol: Modbus-RTU COM2 Southbound ● Connects to a southbound device. communications ● Supported protocol: Modbus-RTU port 2 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54 MDU port Connects to the MUS05A (DB26) port on the MDU for power supply and communication. Table 2-8 Pin definitions for the COM1 port Appearance COM1 Port RS485_R- RS485_R+ 12V_PORT Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55: Intelligent Detection Card

    Figure 2-18 DO port wiring methods 2.6.5 Intelligent Detection Card The card detects the temperatures of copper bars for batteries, bypass input, mains input, and output. It is hot-swappable and 1 U high. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 56 Reserved FE_1 Reserved COM_OUT Reserved Table 2-10 Pin definitions for the FE_1 and COM_OUT ports Appearance FE_1 Port COM_OUT Port FE4_TX+ RS485+ FE4_TX- RS485- FE4_RX+ RS485+ RS485- FE4_RX- CANH Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57: Internal Switch

    Ambient T/H sensor Monitors the ambient temperature and humidity. It (battery can also be used to monitor the battery temperature sensor) temperature. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58: Surge Protection Box

    2.7.2 Surge Protection Box The surge protection box is used to improve the surge protection capability for the UPS. It applies to a three-phase + PE power system. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59: Dry Contact Extended Card

    System Info. > Settings > Dry DO_5 Contact Settings on the LCD and set MUE07A DO_1, MUE07A DO_2, MUE07A DO_3, MUE07A DO_4 and MUE07A DO_5 as required. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 60: Backfeed Protection Card

    2.7.4 Backfeed Protection Card When energy backfeed occurs, the backfeed protection card sends signals to trigger alarm signals or quickly disconnect the feedback loop. The card is hot swappable. Figure 2-24 Appearance Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 61: Ambient T/H Sensor

    The ambient T/H sensor can also be used as a battery temperature sensor. The monitoring module distinguishes these two types of sensors through their DIP switch settings. Figure 2-25 Appearance (1) RJ11 ports Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 62: Module

    WCDMA B8, LTE-FDD B1, LTE-FDD B3, LTE-FDD B7, LTE-FDD B8, LTE-FDD B20, LTE-FDD B38, LTE-FDD B40, and LTE-FDD B41. Figure 2-26 4G module (1) Indicator (2) SIM card installation position (3) Module installation port (4) Base (5) USB cable Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 63: Pvc For Rear Copper Bar Protection

    2.7.7 PVC for Rear Copper Bar Protection The material protects copper bars at the rear of the cabinet. Figure 2-27 Appearance 2.7.8 Bottom Cabling Cabinet It applies to the bottom cabling scenario. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 64: Top Outlet Kit

    2.7.10 BCB Box The BCB box controls the connection between battery strings and the UPS, and supports overload protection, short circuit protection, and remote trip control. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 65: Fasteners For Installation Against A Wall

    (1) Connecting kits (2) Rear anchor fasteners (3) T-shaped bolts (4) M12 bolts (5) Floor mounting kits (6) M16 nuts, spring washers, and flat washers (7) Front anchor fasteners Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 66: Technical Specifications

    Internal Switch Specifications Maintenance Bypass Mains Input Switch Bypass Input Switch Output Switch Switch 690 V AC/1250 A/3P 690 V AC/1250 A/3P 690 V AC/1250 A/3P 690 V AC/1250 A/3P Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 67 (capacity: 400 kVA) Power system Three-phase four-wire + PE Rated frequency 50/60 Hz Frequency range 50/60 Hz±6 Hz (adjustable with a tolerance of 0.5–6 Hz, ±2 Hz by default) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 68 If a utility power outage occurs, batteries can start the UPS to supply power to loads. Charger output power The maximum charge power is 15% of power of a single module, and the charge current is limited to 30 A. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 69 ● S-ECO mode: 0 ms (supported only by the three-phase four-wire model in the 380 V/400 V/415 V system) Output voltage ● Voltage imbalance: ±1% imbalance ● Phase imbalance: 120±1° (balanced load and unbalanced load) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 70 ECO in a parallel Supported system No-load loss 4.5 kW Number of parallel A maximum of six UPSs can be connected in parallel. UPSs Power distribution TN-C, TN-S, TN-C-S, TT system Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 71: Physical And Electrical Specifications (500K)

    ● 30–40°C: not derated at 342–485 V, derated from 100% load to 45% load at 342–191 V, and derated from 45% load to 35% load at 191– 138 V Rated frequency 50/60 Hz Frequency range 40–70 Hz Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 72 The UPS supports the SmartLi. For details about related parameters, see the SmartLi user manual. Item Specifications Battery type ● Lead-acid battery (VRLA) ● SmartLi: For the supported version, contact technical support. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 73 ● Float charging voltage: 2.25 V/cell Output Electrical Specifications Item Specifications Rated voltage 380 V AC 400 V AC 415 V AC Current (capacity: 500 760 A 722 A 696 A kVA) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 74 ● Load > 150%: transfers to bypass mode after 200 ms or longer Inverter output short- If the initial load rate is less than 40%, the inverter output short-circuit circuit capability can tolerate twice the rated current for 300 ms. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 75: Physical And Electrical Specifications (600K)

    Supports dry contacts, RS485 ports, and FE ports. Supports SNMP and Modbus. Dimensions (H x W x 2000 mm x 800 mm x 1000 mm Weight ≤ 860 kg Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 76 ● One power source ● The input THDu is less than 2%. Bypass Input Electrical Specifications Item Specifications Rated voltage (line 380 V AC 400 V AC 415 V AC voltage) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 77 Batteries have no neutral wire, and an odd number of batteries are supported. Nominal discharge 1330 A (480 V, forty 12 V batteries in standard configuration) current (lead-acid battery) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 78 ● S-ECO mode: 0 ms (supported only by the three-phase four-wire model in the 380 V/400 V/415 V system) Output voltage ● Voltage imbalance: ±1% imbalance ● Phase imbalance: 120±1° (balanced load and unbalanced load) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 79 Redundancy design for parallel signals reliability ECO in a parallel Supported system No-load loss 4.5 kW Number of parallel A maximum of six UPSs can be connected in parallel. UPSs Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 80: Physical And Electrical Specifications (600K, 02314Bmv)

    Rated voltage (line 380 V AC 400 V AC 415 V AC voltage) Rated current 1115 A 1059 A 1021 A (capacity: 600 kVA) Power system Three-phase four-wire + PE Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 81 50/60 Hz±6 Hz (adjustable with a tolerance of 0.5–6 Hz, ±2 Hz by default) Input mode The mains input and bypass input share a power source (by default) or use different power sources. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 82 No battery is shared by default. ● SmartLi 2.0: Battery string sharing is supported in a parallel system. No battery is shared by default. ● SmartLi 3.0: Battery string sharing is not supported. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 83 ● Load > 150%: transfers to bypass mode after 200 ms or longer Inverter output short- If the initial load rate is less than 40%, the inverter output short-circuit circuit capability can tolerate twice the rated current for 300 ms. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 84: Current Specifications (200K-600K)

    929 A 882 A 851 A 400 kVA 743 A 706 A 680 A 300 kVA 557 A 529 A 510 A 200 kVA 372 A 353 A 340 A Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 85: Environmental Specifications

    Temperature derating coefficient: not derated at 0°C–40°C, derated to 90% at 41°C–45°C, derated to 80% at 46°C–50°C, and derated to 70% at 51°C–55°C Storage temperature –40°C to +70°C Relative humidity 0–95% RH (non-condensing) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 86: Safety Compliance And Emc Specifications

    ESD immunity IEC 61000-4-2 Conducted EN/IEC 62040-2 susceptibility EN/IEC 61000-4-6 Radiated susceptibility EN/IEC 62040-2 EN/IEC 61000-4-3 Electrical fast transient EN/IEC 62040-2 IEC 61000-4-4 Surge EN/IEC 62040-2 IEC 61000-4-5 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 87: Component Technical Specifications

    Table 3-6 Internal switch Item Specifications Frame size current 1250 A Rated operating current 1250 A Number of poles Frequency 50 Hz/60 Hz Rated operating voltage 690 V AC Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 88 Rated current 400 A 630 A 800 A Rated voltage 750 V DC 750 V DC 750 V DC Breaking capacity 16 kA 20 kA 36 kA IP rating Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 89: Installation And Cable Connection

    Reserve the following clearances around the cabinet to facilitate operations and ventilation: ● Reserve a clearance of at least 950 mm from the front of the cabinet for ventilation and operations. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 90 Configuration Dimensions (Unit: mm) 400K–600K: top cable routing, rear air 2000 exhaust 400K–600K: bottom cable routing, rear air 2200 1200 exhaust 400K–600K: top cable routing, top air 2350 exhaust Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 91: Installation Preparations

    The cable tray needs to be provided by the customer. The figure is for reference only. The actual cable tray purchased based on the site survey may vary. 4.2 Installation Preparations 4.2.1 Tools The onsite operation personnel can select tools based on the site requirements. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 92 Personal protective equipment Safety helmet Goggles Protective shoes Reflective vest ESD gloves Insulated gloves Protective gloves Safety harness Dust mask Insulated shoes Transportation tools Lifting trolley Electric forklift Manual pallet truck Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 93 (M8/M10/M12/ M16) Adjustable torque Hammer drill Hammer drill bit Claw hammer wrench (Φ16 mm) Electric Step ladder Pliers Rubber mallet screwdriver Utility knife Marker Rivet gun Insulated ladder Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 94 Cord end terminal Heat gun Scissors pliers crimping tool Measurement instruments Height gauge Laser locator Electroprobe Thermometer Clamp meter Soft measuring Steel measuring Square tape tape Level Laptop Level gauge Multimeter Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 95 4 Installation and Cable Connection Network tester Phase sequence Dielectric strength Megohmmeter meter tester Machinery Small cutter Cable reel Engineering auxiliary materials Label Cable tie Cotton cloth Sandpaper Heat-shrink Insulation tape tubing Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 96 User Manual (100 kVA Power Module) 4 Installation and Cable Connection Other tools Electrician's knife Hacksaw Powder marker Glue gun Brush Paint brush Vacuum cleaner Flashlight Insulation pad SPD extracting Hole saw tool Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 97: Power Cables

    IEC-60364-5-52 standard and SmartLi user manual ● When the mains input and bypass input share a power source, configure mains input power cables as input power cables. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 98 GND: 16 L2: 3x185 L2: 3x185 V: 3x185 -: 3x185 L3: 3x185 L3: 3x185 W: 3x185 PE: 240 N: 3x185 N: 3x185 N: 3x185 PE: 240 PE: 240 PE: 240 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 99: Power Cable Terminals

    Crimped DT terminal 30 mm 47 N·m Equipotential Crimped DT terminal 20 mm 4.5 N·m ground 4.2.4 Recommended Circuit Breakers ● The input circuit breakers recommended are for reference only. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 100: Other Optional Components

    Name Specifications Quantity Remarks (PCS) Cable Double-insulated twisted cable. If the cable Several Provided by length is within 25–50 m, the cross-sectional the customer area must be 0.5–1.5 mm Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 101 Backfeed Protection Card Table 4-8 Configuration table Name Appearance or Specifications Quantity Remarks (PCS) Backfeed Delivered with the product protection card 4-pin terminal Delivered with the product block Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 102 Three-phase four-wire 380 V 220 V Three-phase four-wire 400 V 230 V Three-phase four-wire 415 V 240 V Three-phase four-wire 480 V 230 V Three-phase three-wire 380 V 230 V Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 103 RJ11 connector Several Delivered with the product Dry Contact Extended Card Table 4-11 Configuration table Name Appearance or Specifications Quantity Remarks (PCS) Dry contact Delivered with extended card the product Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 104: Transportation, Unpacking, And Checking

    If there is any discrepancy, keep a record and contact the supplier immediately. Step 4 Remove the bolts that secure the cabinet to the pallet and move the cabinet from the pallet. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 105: Installation Process

    Figure 4-4 Removing the pallet ----End 4.4 Installation Process NO TICE For details about how to install the UPS5000-H-600K-FT (02314BMV), see the corresponding FusionPower6000 installation guide. Figure 4-5 Installation process Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 106: Installing Pvc Components For Rear Copper Bar Protection

    Step 1 Remove the UPS rear door panels. Step 2 Install copper bar protection components. Figure 4-6 Installing copper bar protection components Step 3 Reinstall the UPS rear door panels. ----End 4.6 Installing Cabinets Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 107: Top Cable Routing + Rear Air Exhaust Configuration

    Knock the expansion bolt into the hole until the expansion tube completely fits into the hole. The expansion sleeve must be completely buried under the ground to facilitate subsequent installation. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 108 Step 3 Move the cabinet to the installation position. Step 4 Secure the cabinet to the floor. Figure 4-9 Securing a cabinet Step 5 Install anchor baffle plates around the cabinet. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 109 Figure 4-11 Hole positions on the channel steel (optional) (1) Hole positions on the channel steel Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 110: Bottom Cable Routing + Rear Air Exhaust Configuration

    Partially tighten the expansion bolt and vertically insert it into the hole. Knock the expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the hole. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 111 (2) Spring washer (3) Flat washer (4) Expansion sleeve (5) Expansion nut (6) Concrete floor Step 3 Remove the UPS cabinet side panels. Figure 4-14 Removing the side panel Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 112 Combine the cabinets. Figure 4-15 Combining cabinets Step 7 Secure the cabinets to the floor. Figure 4-16 Securing a cabinet Step 8 Install anchor baffle plates around the cabinet. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 113 Figure 4-18 Hole positions on the channel steel (optional) (1) Hole positions on the channel steel Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 114: Top Cable Routing + Top Air Exhaust Configuration

    ● The customer needs to purchase the expansion bolts used for securing the cabinet. Step 1 Determine the cabinet installation position on the floor based on the mounting holes in the marking-off template. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 115 The expansion sleeve must be completely buried under the ground to facilitate subsequent installation. Figure 4-20 Installing an expansion sleeve (1) M12x60 bolt (2) Spring washer (3) Flat washer (4) Expansion sleeve (5) Expansion nut (6) Concrete floor Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 116 Step 1 Determine the cabinet installation position on the channel steel based on the mounting holes in the marking-off template or the hole dimensions diagram. Step 2 Drill mounting holes on the channel steel using a hammer drill. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 117: Top Cable Routing + Top Air Exhaust Configuration (With Antiseismic Requirements)

    Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 118 ● The customer needs to purchase the expansion bolts used for securing the cabinet. Step 1 Determine the cabinet installation position on the floor based on the mounting holes in the marking-off template. Figure 4-25 Marking-off template Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 119 Knock the expansion bolt into the hole until the expansion tube completely fits into the hole. The expansion sleeve must be completely buried under the ground to facilitate subsequent installation. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 120 Step 3 Secure the floor mounting kits to the floor. Figure 4-28 Securing floor mounting kits Step 4 Secure the rear anchor fasteners to the rear anchors of the cabinet. Figure 4-29 Securing rear anchor fasteners Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 121 Figure 4-31 Securing a cabinet Step 8 Tighten the T-shaped bolts. Rotate the T-shaped bolts by 90 degrees and ensure that the bolt heads are clamped to the channel steel. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 122 NO TICE Ensure that the front slots of the T-shaped bolts are vertical. Step 9 Install anchor baffle plates around the cabinet. Figure 4-33 Installing anchor baffle plates ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 123 Step 6 Insert and tighten the T-shaped bolts. Step 7 Secure the cabinet to the channel steel. Step 8 Install anchor baffle plates around the cabinet. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 124: Installing A Top Protection Component

    ● The number and colors of cables in the figures are for reference only. ● Wear insulated gloves and use insulated tools to prevent electric shocks or short circuits. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 125: Cable Routing Requirements

    Step 4 Connect the cable with a crimped terminal to the corresponding copper bar. Step 5 Bind the cable to the nearby beam. Step 6 Clear sundries inside the cabinet. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 126: Top Cable Routing

    Step 1 Remove the top cover (you do not need to reinstall it later). Figure 4-38 Removing the cover Step 2 Remove the epoxy separators between the top copper bars. Figure 4-39 Removing epoxy separators Step 3 Install ground cables. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 127 When installing AC input power cables, if there are a great number of cables and the wiring holes in the mains input copper bar are insufficient, connect the cables to the corresponding holes in the bypass input copper bar. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 128 (3) Output power cables (U, (L1–L3, N) V, W, N) ● Two power sources Figure 4-42 Removing the copper bars of the same power source for mains and bypass inputs Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 129 Step 6 Arrange cables, install the top beams (delivered with the product) on the top cover, and separate the mains input cables, bypass input cables, and output cables from each other. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 130 ● Do not bind signal cables and power cables together. ● RS485 cables and FE cables must be shielded cables. ● The cable connection between the UPS and the SmartLi is used as an example in the figure. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 131: Bottom Cable Routing

    Step 1 Remove the top cover. (There is no need to reinstall it.) Figure 4-47 Removing the cover Step 2 Remove the bottom cabling cover from the bottom cabling cabinet. Step 3 Remove the epoxy separators between the top copper bars. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 132 4 Installation and Cable Connection Figure 4-48 Removing epoxy separators Step 4 Install ground cables. Figure 4-49 Installing ground cables (1) PE (2) Equipotential ground Step 5 Install the cables. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 133 Figure 4-50 Installing cables ● Two power sources Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 134 User Manual (100 kVA Power Module) 4 Installation and Cable Connection Figure 4-51 Removing the copper bars of the same power source for mains and bypass inputs Figure 4-52 Installing cables Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 135 ● If the UPS needs to connect to the NetEco, connect the NetEco to the FE port on the monitoring interface card of the UPS over a LAN switch. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 136 ● The cable connection between the UPS and the SmartLi is used as an example in the figure. Figure 4-55 Installing signal cables between the UPS and the SmartLi (1) Monitoring interface unit in the master SmartLi cabinet ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 137: Installing A Top Enclosure Frame

    Step 2 Install a top frame on the top of the cabinet. Figure 4-57 Installing a top frame Step 3 Install mounting plates at the front and rear of the top frame. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 138: Installing Optional Components

    For the three-phase four-wire model, if the TN-C system is adopted, short-circuit the input N and PE, and connect the input PE and N to terminals on the N bar. Recommended cable cross-sectional area: 240 mm Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 139: Connecting A Remote Epo Switch

    UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) 4 Installation and Cable Connection Figure 4-59 Short-circuiting the input N and PE 4.10.2 Connecting a Remote EPO Switch Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 140: Installing An Ambient T/H Sensor

    EPO_12V. When you turn on the EPO switch, EPO is triggered. 4.10.3 Installing an Ambient T/H Sensor Context If an ambient T/H sensor is configured, perform the following steps to install it. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 141 Step 3 Connect the RJ11 port on the ambient T/H sensor to the COM1 port on the monitoring interface card. Figure 4-64 Connecting cables (1) Cascaded with other T/H sensors ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 142: Installing A 4G Module Or Network Cable

    ● The figure uses top cable routing as an example. The installation positions are the same for bottom cable routing and top air-flow configuration. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 143 FE Access Scenario Step 1 Connect the network port on a LAN switch or router to the FE port on the monitoring interface card. Figure 4-67 Connecting a cable ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 144: Installing A Dry Contact Extended Card

    DOs transmit passive dry contact output signals. Users need to connect an external power supply to DOs. The maximum voltage and current of the external power supply are 30 V DC/1 A. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 145: Installing A Backfeed Protection Card

    4.10.6.1 Cable Routing Figure 4-71 Cable routing if the UPS is used for power supply (1) Fuse terminal (2) Backfeed protection card Step 1 Remove the power distribution cover. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 146: Installation And Cable Connection

    Figure 4-73 Installing a backfeed protection card ● If both a backfeed protection card and a dry contact extended card are configured (An ECM expansion subrack is required, which is installed before delivery.) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 147 If a third-party reliable power supply is used, use the power signal with a voltage of 240 V AC or less and a current of less than 6 A. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 148: Installing Parallel Cables

    Step 2 Choose a parallel mode and connect power cables to the parallel system based on site requirements. The typical scenario of a 1+1 parallel system is used as an example. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 149 A dual-bus parallel system consisting of two parallel subsystems is used as an example. Figure 4-78 Conceptual diagram of a dual-bus parallel system Step 3 Pre-route the UPS parallel cables and place the parallel cable connectors near the PARALLEL ports. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 150: Verifying The Installation

    Labels on the busway and Both ends of a busway and cable are cables labeled. Labels are concise and easy to understand. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 151 Any damaged air filter should be replaced promptly. Removing an air filter will compromise the equipment performance, which may result in equipment damage. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 152: Sealing Cabinets

    (3) Sealing putty (with the transparent film facing upward) Step 3 Reinstall all covers. Step 4 Close the cabinet doors. NO TICE Do not remove the dust cover from the UPS before power-on. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 153 UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) 4 Installation and Cable Connection Figure 4-81 Dust cover (1) Dust cover ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 154: Single Ups Commissioning

    Insert the switch handle in place, and then rotate the switch handle. Pull out the switch handle and place it back on the tray of the front door. Ensure that the triangle arrow on the flange points to ON. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 155: Initial Startup

    Data Center Facility Deployment Guide . app. For details, see the Step 2 Set the language, time and date, network parameters, system parameters, and battery parameters on the Settings Wizard screen. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 156 ● Set Output frequency correctly. Otherwise, loads may be affected and the UPS may not work properly. ● Set all battery parameters correctly based on site requirements. Battery parameter settings are critical to battery maintenance, battery lifespan, and UPS discharge time. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 157 Step 3 After you set parameters on the Settings Wizard screen, the system displays the Bypass mode and No battery alarms, which do not need to be handled. Other alarms need to be handled. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 158: Setting Parameters For Optional Components

    If Access authentication code on the iManager-M Service screen is empty, obtain the authentication code from the position shown in the following figure and enter it in Access authentication code. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 159 Choose Monitoring > Wireless Module > Running Parameter on the WebUI. Set Mobile data to Enable and set operator parameters based on site requirements. Step 2 Check the running status of the wireless module. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 160 Choose System Settings > NMS Application > BIN > Communication Parameters on the WebUI. Set parameters as follows: – Address type: Domain name – Server domain name and Port number: Retain the default values. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 161: Setting Bcb Parameters

    The ambient T/H sensor can also be used as a battery temperature sensor. The monitoring module distinguishes these two types of sensors through their DIP switch settings. Procedure Step 1 Set the DIP switch. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 162 When an ambient T/H sensor is used as a battery temperature sensor, set the DIP switch to a value in the range of 16 to 28 to monitor the battery temperature. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 163: Setting Parameters For The Backfeed Protection Card

    5.1.3.4 Setting Parameters for the Backfeed Protection Card Prerequisites A backfeed protection card is installed. Procedure Step 1 On the LCD, choose System Info > Settings > Dry Contact Set and set MUE06A connection to Enable. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 164: Setting Parameters For The Bottom Cabling Cabinet

    THDi, load power factor, and real-time input voltage waveform. – S-ECO mode VFI: When the input voltage is of poor quality and fluctuates greatly (the voltage and frequency exceed the specifications, the power Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 165 Working mode to S-ECO. The information indicating that the UPS works in S- ECO mode is displayed on the LCD. Step 2 Set parameters. Figure 5-7 S-ECO mode parameters 1 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 166 UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) 5 Single UPS Commissioning Figure 5-8 S-ECO mode parameters 2 Figure 5-9 S-ECO mode parameters 3 Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 167 ±8%, ±9%, ±10% bypass voltage and the rated voltage is greater than the specified value, the system determines that the ECO voltage is abnormal and transfers to inverter mode. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 168 If the inverter is not started, the UPS stops supplying power when the bypass is abnormal, and the system may power off. Figure 5-10 S-ECO system status (VFI) Figure 5-11 S-ECO system status (VFD) Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 169: Setting The Eco Mode

    Step 1 On the LCD, choose System Info > Settings > System Settings and set Working mode to ECO. The information indicating that the UPS works in ECO mode is displayed on the LCD. Step 2 Set the ECO voltage range. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 170: Setting The Hibernation Mode

    If the inverter is not started, the UPS stops supplying power when the bypass is abnormal, and the system may power off. Figure 5-14 System status in ECO mode ----End 5.1.4.3 Setting the Hibernation Mode Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 171 Step 2 Set Module cycle hiber period(d) to an integer ranging from 1 to 100. The default value is 30. Figure 5-15 System settings NO TE Click Submit after setting parameters on the WebUI. Step 3 After the setting is complete, check the status. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 172: Setting The Peak Shaving Mode

    5.1.4.4 Setting the Peak Shaving Mode Prerequisites ● The peak shaving mode is supported only when the UPS works in normal mode and SmartLi batteries (lithium batteries developed by Huawei) are connected. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 173 Enable, related parameters are set, and configuration files are imported, active charging and discharging management can be implemented based on the peak and off-peak electricity price periods to save energy. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 174 ● The current period must not overlap with other periods. Peak shaving Specifies the start time and 00:00:00 00:00:00–23:59:59 charge start time end time of battery charge 1/2/3/4/5/6 during off-peak hours. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 175 When the battery backup time is greater than the preset value, the system continues to implement peak shaving based on the preset rules. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 176 The parameter settings must meet the verification rules of the template. Otherwise, a Bin file cannot be generated. Save the electricity price template and generate a 2.0 Bin file. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 177: Starting The Inverter

    (common user) 000001 Changeme NO TE Change the password after your first login to prevent unauthorized access. You can choose System Info > Settings > User Settings and change Password. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 178: Powering On Loads

    UPS. The No battery alarm on the MDU disappears. Step 2 Turn on the downstream output switch to supply power to loads. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 179: Shutting Down And Powering Off The Ups

    The Bypass mode alarm is displayed on the LCD. Figure 5-21 Normal bypass After you shut down the inverter, the UPS supplies no power if the bypass is abnormal, which causes a power failure for the loads. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 180 Figure 5-23 Turning off a switch NO TE Switches share one switch handle. Take out the handle when you operate different switches and reinstall it after the operations are complete. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 181 UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) 5 Single UPS Commissioning Step 5 Turn off the upstream mains and bypass input switches. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 182: Parallel System Commissioning

    Loosen the captive screws on an ECM. Push the micro switch on the ejector lever. Pull the ejector lever outwards to remove the ECM from the subrack. Remove the ECM. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 183 Step 6 Remove the jumper caps from other UPSs in the same way. Step 7 Disconnect the ground cable of the ESD wrist strap, and remove the ESD wrist strap and ESD gloves. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 184: Starting A Parallel System

    0570-002 BPM unit abnormal. In this case, you need to power off the rack to clear the alarm. Figure 6-3 Schematic diagram Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 185 If a single UPS is not powered off after commissioning, verify on the monitoring screen that EPO has been activated successfully. Step 3 Install parallel cables between parallel cabinets. Figure 6-4 Control cable connections in a parallel system of four UPSs Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 186 UPSs. Battery Settings: On the LCD, choose System Info > Settings > Battery Settings. Alternatively, on the WebUI, choose Monitoring > Battery System > Running Parameter > Battery Settings. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 187 UPSs. Perform the same operations on phases B and C. Complete the measurement between every two UPSs in the parallel system. If the phase sequence is correct and the Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 188: Shutting Down And Powering Off A Parallel System

    Paral. Inv. ON on the LCD screen Common Functions. ----End 6.3 Shutting Down and Powering Off a Parallel System Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 189: Performing Epo

    BSC systems) during initial startup, and change the settings under the guidance of maintenance engineers when needed. Set the BSC master and slave systems to master and slave modes respectively. Procedure Step 1 Connect BSC cables. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 190 On the LCD, choose System Info > Settings > System Settings and set BSC master/slave mode to BSC slave system Step 5 Check that the valid phase voltage difference between UPS systems is less than 5 ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 191: Maintenance

    ● Maintain UPSs regularly based on the following requirements. Otherwise, the UPSs may fail to operate properly and the service life may be shortened. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 192: Monthly Maintenance

    Check Item Expected Result Troubleshooting Cleanliness Wipe the cabinet surface using Remove the dust, especially a white paper and the paper from the front panel. does not turn black. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 193: Annual Maintenance

    ● Replace the cables. ● The allowed through- current capacity of cables is greater than the circuit breaker specifications. 7.2 Lead-Acid Battery Maintenance Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 194: Precautions For Battery Maintenance

    ● The battery terminals are intact. ● Batteries are free from damage and cracks. ● Batteries are free from acid leakage. ● Batteries are not deformed or bulged. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 195: Quarterly Maintenance

    2. Replace the battery than 3°C. temperature sensor. Battery management The settings of battery Set parameters correctly. parameter settings management parameters meet the requirements in the user manual. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 196: Annual Maintenance

    When the UPS is backed up, 1. Locate the fault cause. discharge a battery to the 2. If the fault persists, contact undervoltage alarm threshold technical support. to refresh the capacity of the battery. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 197: Testing Batteries

    Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start on the right of Forced Equalized Charging to start a forced equalized charging test. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 198: Performing A Shallow Discharge Test

    UPS UI, the battery capacity displayed on the monitoring UI of the SmartLi should be used during a shallow discharge test. Otherwise, batteries may be completely discharged. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 199: Performing A Capacity Test

    ● An alarm is generated. ----End 7.3.1.3 Performing a Capacity Test Context This item allows you to fully discharge batteries. A deep discharge test is conducted to obtain the battery discharge performance data. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 200 Save the test data obtained from the latest 36 tests. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 201: Lithium Battery Test

    On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Tap Start on the right of Shallow Dis. Test to start a shallow discharge test. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 202: Performing A Capacity Test

    Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start on the right of Capacity Test to start a capacity test. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 203: Performing A Group Capacity Test

    No generator is connected to the UPS. ● The mains, batteries, charger, and discharger are normal. No overload alarm is generated. ● The SmartLi generates no alarms related to lithium batteries. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 204: Downloading The Test Data

    Step 1 On the WebUI, choose Query > Battery Test Records, choose logs that need to be queried from the Log drop-down list box, and click Query. Figure 7-7 Battery Test Records Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 205 UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) 7 Maintenance Step 2 Choose logs that have been queried from the Log drop-down list box, and click Export. ----End Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 206: Troubleshooting

    EOD voltage and 11.3 V/cell. For details about how to rectify common faults, see Table 8-1. If any UPS5000 Alarm Reference or contact technical unmentioned faults occur, see the support. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 207 The buzzer buzzes, The bypass thyristor Replace the bypass bypass is and the fault is damaged. module. abnormal indicator is on. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 208 The bypass module Reduce the load, or experiences improve ventilation. overtemperature. NO TE For details about component replacement and maintenance involved in Troubleshooting and UPS5000 Alarm Reference, consult maintenance engineers. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 209: Faq

    Step 4 Use a multimeter to measure the voltages of the positive and negative battery strings connected to the UPS battery input terminals. If the measured values are Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 210: Transferring To Maintenance Bypass Mode

    Insert the switch handle in place, and then rotate the switch handle. Pull out the switch handle and place it back on the tray of the front door. Ensure that the triangle arrow on the flange points to ON. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 211: Transferring From Maintenance Bypass Mode To Inverter Mode

    ● To turn off a switch, insert the switch handle in place, and then rotate the handle. ● After turning off the switch, ensure that the triangle arrow on the flange points to OFF. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 212: Performing Epo

    EPO alarm is cleared. ● On the WebUI Choose Monitoring > UPS System > Running Control > System Commands and Tests and click Clear Faults. The EPO alarm is cleared. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 213: Exporting Data

    Figure 9-3 Exporting data WebUI ● Exporting fault information Choose Maintenance > Fault Information, set Encryption password for export, click Export Fault Information, and specify a path to save the exported data. Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 214: Obtaining Active Alarm Details

    9.7 Obtaining Active Alarm Details Choose System Info > Alarms > Active Alarms on the LCD, and tap an alarm ID to view the alarm details. Figure 9-6 Active Alarms Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 215: Appendix

    You can decide whether to choose it based on site requirements. Appearance Figure 10-1 Lifting trolley (1) Tabletop (2) Handle (3) Lowering switch (4) Elevating pedal (5) Foot brake Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 216: Acronyms And Abbreviations

    Step 3 Repeatedly step on the elevating pedal to raise the tabletop to a proper height. Step 4 Lift the lowering switch to slowly lower the tabletop to the required height. ----End 10.2 Acronyms and Abbreviations American wire gauge bus synchronization controller Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 217 Conformite Europeenne economic control operation emergency power off energy control module end of discharge International Electrotechnical Commission liquid crystal display monitoring display unit protective earthing power distribution unit Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 218 THDi total distortion of the input current waveform THDv total harmonic distortion of output voltage uninterruptible power system Universal Serial Bus VRLA valve-regulated lead acid battery voltage frequency independent Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 219 UPS5000-H-(400 kVA-600 kVA)-FT User Manual (100 kVA Power Module) 10 Appendix voltage frequency dependent voltage independent Issue 03 (2022-11-29) Copyright © Huawei Digital Power Technologies Co., Ltd.