8.1 SAFETY AND INSTALLATION
Make sure you have read and follow the
the previous sections.
8.2 LOCATION
Move the ECD SmartDRY™ Cabinet into the desired position. Refer to topic
tance.
8.3 FILIMENT REEL RACK CONFIGURATION
Install the filiment reel racks to meet your storage requirements.
8.4 POWER
Connect to properly grounded power plug.
SD Series Dry Cabinets Setup and Operation Manual | A62-3337-00 Rev: 1.0.0
4.0 Operators Safety Information
and
5.0 Setup
recommendations in
5.2 Location
for minimum dis-
Page 30