3) Reconnect all the wire harnesses. Connectors with the latch will "snap" into place when the connector
is correctly seated.
Make sure large resistor is upright away from components.
Step 3 - Final Assembly:
1) Replace the top cover:
Lower the top cover and connect light tower option to J5 on Power Board, if included.
Set the cover into the top slots.
Slide the top cover forward about 2 cm (1/2") to lock down in place.
Replace the 4 to 6 screws (model dependent) on the back of the top cover.
2) Connect power to test.
SD Series Dry Cabinets Setup and Operation Manual | A62-3337-00 Rev: 1.0.0