ECD SmartDRY SD Series Setup And Operation Manual page 20

Dry cabinets
Hide thumbs Also See for SmartDRY SD Series:
Table of Contents

Advertisement

IF YOU WANT TO SECURE THE LIGHT TOWER TO THE MOUNTING BRACKET, REMOVE THE BRACKET
FROM THE CONTROL CHASSIS COVER AND MOUNT THE BRACKET TO THE LIGHT TOWER WITH THE
PROVIDED SCREWS.
RE-MOUNT THE LIGHT TOWER TO THE CONTROL CHASSIS COVER WITH FOUR SELF TAPPING SHEET
METAL SCREWS (#6 X 3/8").
SD Series Dry Cabinets Setup and Operation Manual | A62-3337-00 Rev: 1.0.0
Page 14

Advertisement

Table of Contents
loading

Table of Contents