VersiCharge™ AC Installation and Operations Manual
2.2 Mounting Using a Stud – Recommended Stud Mounting
(use center-top and bottom holes)
Figure 1. Align the mounting bracket and screw into the stud
NOTE: For installation, the mounting-bracket hinges will be pointing to the ceiling and the flat side of the
bracket will be against the wall.
1.
Locate a stud within the wall that can handle the 17+ lb. load of the VersiCharge.
2.
Place the mounting bracket no more than 12" above a 240 V outlet; level the mounting bracket and drill the
center-top hole using a drill with an extender.
3.
Mount the bracket using the top hole and the lag screws, do not tighten all the way.
4.
Level the bracket.
5.
Drill a pilot hole for the center-bottom hole.
6.
Secure with lag screws.
7.
Tighten the top and bottom screws securely using an Allen wrench.
• For concrete cinder block walls, install appropriate anchors. If using an existing outlet, ensure that the power cord
will reach to the outlet. Using a 7/16" socket, attach the mounting bracket to the wall in compliance with NEC® and
local jurisdiction requirements, using the two lag screws provided.
• For Siemens post installation, see the post instruction manual at usa.siemens.com/versichargecommercial.