Step 3 Verify that the power-on process is normal by referring to
Checking for
Step 4 (Optional) If initial configurations are involved, verify that the initial parameter
values are correct by referring to
● For details about initial configurations, see the initial configuration parameter
manual for the solution in use.
● Initial configurations must be verified before the first power-on after
installation or restart after a long power-off period.
● Equipment with initial configurations can be powered on only after the initial
configurations are verified.
----End

6.2 Normal Power-On Checking for Components

Table 6-1 Checking after power-on
System
Power
supply and
distributio
n system
Issue 03 (2022-12-15)
Components.
NO TICE
NO TE
For details about initial configuration parameters in the FusionModule1000, see the initial
configuration parameter manual for the solution in use.
Check
Item
PDB
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core
Check
Check Standard
Item
ATS
8D ATS Scenario:
● The switch handle has been removed.
● Circuit breakers of the two power
inputs to the ATS operation
mechanism have been switched on.
● The motor fuse is intact.
● The Man./M selection lever is flipped
to M.
● The controller has no alarm.
● The AUTO LED indicator is on.
ATS (02409423) Scenario:
● ATS monitoring module has no
alarms.
● Verify that the phase sequences of the
two power inputs to the ATS are
correct
● The AUTO LED indicator is on.
6 Power-On Commissioning
6.2 Normal Power-On
Components.