To create management domain, note that:
Procedure
Step 1 Choose System > Configuration Management > Data Center Planning from the
main menu. The Data Center Planning window is displayed.
Step 2 Add managed domains.
1.
2.
3.
4.
Issue 03 (2022-12-15)
You can create Park, Building, ContainerDC, Room, Subnet, NetecoSite,
FusionModule500, Modular, Room–ShapeNode, and Building–ShapeNode
under Root.
You can create Building, Building–ShapeNode, ContainerDC, Room and
Room–ShapeNode under Park.
You can create only Floor–ShapeNode under Building.
You can create DDF, Battery Cabinet, Rack, Modular, Power Cabinet, Fire
Protection Cabinet and Rack Custom under Room
You can create Container and Container–ShapeNode under ContainerDC.
You can create Modular, Park, NetecoSite, FusionModule500 and under
Subnet.
You can create DDF, Battery Cabinet, Rack, Modular, Power Cabinet, and
Fire Protection Cabinet and Rack Custom under NetecoSite
You can create DDF, Battery Cabinet, Rack, Power Cabinet, Fire Protection
Cabinet and Rack Custom under Modular.
You can create DDF, Battery Cabinet, Rack, Modular, Power Cabinet, Fire
Protection Cabinet and Rack Custom under Room–ShapeNode.
You can create Floor–ShapeNode under Building–ShapeNode.
You can create Room and Room–ShapeNode under Floor–ShapeNode.
In the navigation tree, choose the father node where you want to add a
managed domain.
In the Domain area which is below the navigation tree, drag a managed
domain icon to the required position in the view.
NO TE
You can adjust the shape of Room, Room–ShapeNode, Building–ShapeNode, Floor–
ShapeNode, Container–ShapeNode, NetEco site: Holding down the Shift key and the
left mouse button and then clicking on the corresponding lines can increase the small
yellow dot. You can drag the small yellow dot to adjust the shape of the managed
domain icon.
To delete a domain, click the domain icon and select Delete under
In the right side of the view area, set Management Info. Set parameters as
required. The parameter marked with an asterisk (*) is mandatory.
NO TE
You can configure Management Info, Electricity Info, and Refrigeration Info for the
equipment room management domain.
Click
on the toolbar.
Repeat steps
Step 2.1
Copyright © Huawei Digital Power Technologies Co., Ltd.
to
Step 2.4
until the configuration is complete.