Figure 9-10 Adding the container
Step 6 Set Management Info for the container based on the actual situation.
Step 7 (Optional): Select the ContainerDC to be added. Set parameters in the
Management Info area.
Step 8 Click
----End
Follow-up Procedure
Perform the following operations in the Data Center Planning page as required.
Operation
Text
Issue 03 (2022-12-15)
NO TE
The parameters with * are mandatory.
.
Description
Add the text tool.
● Select the management domain for which you want to add a
text as the comment.
● In the lower left corner of the current page, click Tool and
select the text tool.
● In the Properties area, you can set properties, such as Text
style, Font and Text background, for the text control.
● In the upper area of the current page, click
Copyright © Huawei Digital Power Technologies Co., Ltd.