Huawei FusionModule1000A20 Commissioning Manual page 74

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
Table 9-5 Setting battery parameters
Main
Men
u
Para
mete
rs
Setti
ngs
Step 7 Switch off the AC input circuit breaker.
Issue 03 (2022-12-15)
Secon
Third-
d-
Level
Level
Menu
Menu
Batter
Basic
y
Parame
ters
Other
Parame
ters
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Fourth
Default
Setting
-Level
Value
Menu
Battery
Yes
Yes/No
n
connec
ted
Rated
1000
Sum of
Capaci
Ah
the rated
ty
capacities
of
batteries
installed
under
each
battery
fuse group
Installa
-
Set this
tion
parameter
time
to the
current
time.
Description
The n under the
fourth-level menu
refers to the serial
number of the
battery string and
the n under the
third-level menu
refers to the cabinet
number.
Set this parameter
based on the
number of battery
strings connected to
the power system.
For example, four
battery branches
are reserved in the
power system, but
only battery strings
1, 2 and 3 are
connected to the
system. Then, set
Battery 1–3
Connected to Yes
and Battery 4
Connected to No.
The sum of the
capacities of
batteries under
each battery fuse
group must be the
same.
-
67